Data services

Concession data on request

Tell us the assets, countries or sectors you are working on. We return a workbook of what the public record holds for them: grantor, concessionaire, contract term and contract clauses, with the quote and source beside every figure.

Workbook · Sample row

Indiana Toll Road (I-80/I-90), United States

Item
Concessionaire's failure to perform a material obligation: cure period
Figure, Unit
90days
Verbatim quote
“continues unremedied for a period of 90 days following notice thereof”
Source
Amended and Restated Indiana Toll Road Concession and Lease Agreement, Section 16.1(a)(i), p. 91

The quote is the source's own wording. The page is the printed page of the cited document.

See the sample workbook

What you can ask for

  • A list

    Concessions in the countries or sectors you name, with grantor, concessionaire, contract start and contract end. Example: toll road concessions in Colombia and Peru.
  • An asset file

    What the public record holds on one concession: the parties, the term, the obligations, the investment commitments and the events since signing.
  • A contract comparison

    The same provision across a set of concession agreements, quoted verbatim with its section and page. Example: termination compensation in five airport concessions.
  • An expiry schedule

    Concessions reaching the end of their term in a country or sector, inside a window you set.
  • Anything else

    If a contract, gazette, regulator filing or disclosure states it, you can ask for it. Name the question and we scope it. Example: the state advantages granted to each concessionaire in a country, such as tax exemptions, revenue guarantees, exclusivity and land rights.

What you receive

  • An Excel workbook with one tab per topic and a cover page that explains how to read it.
  • Each figure in its own row, with its unit, its basis, the words of the source that state it, and the document and page they come from.
  • Figures entered as the source prints them. Nothing is totaled, converted or estimated.
  • Where two sources disagree, both figures, each with its own quote.
  • Where the public record does not hold an item, the words "not on record". Gaps are not filled.
  • A sources tab listing every document cited, with its address.

A sample workbook

Indiana Toll Road (I-80/I-90), United States. 33 rows from its concession agreement, the two amendments since and the annual report for 2025, as they appear in a workbook.

Workbook · Sample

Indiana Toll Road (I-80/I-90), United States

Sample workbook

Indiana Toll Road (I-80/I-90), United States

33 rows from four documents the grantor publishes: the concession agreement, its two later amendments and the annual report for 2025.

Contents

  • · The rent paid at closing, the deposit held before it, and the term of the lease.3 rows
  • · What counts as a competing highway, and what follows if one opens.3 rows
  • · Minimum limits the concessionaire must carry.3 rows
  • · Cure periods for each party and for lenders, and the change-in-control threshold.4 rows
  • · Notice of a delay event, mediation before arbitration, governing law.3 rows
  • · Condition of the pavement and bridges, as the annual report for 2025 prints it.6 rows
  • · The original agreement, its seven amendments, the restatement and the two amendments since, by date.11 rows
  • · The documents this sample cites.4 rows

How a workbook reads

  • Each figure in its own row, with its unit, its basis, the words of the source that state it, and the document and page they come from.
  • Figures entered as the source prints them. Nothing is totaled, converted or estimated.
  • Where two sources disagree, both figures, each with its own quote.
  • Where the public record does not hold an item, the words "not on record". Gaps are not filled.
  • A sources tab listing every document cited, with its address.

The rent paid at closing, the deposit held before it, and the term of the lease.

Rent paid to the grantor at closingFigure: 3,800,000,000.00US$Basisin cash, effective at the Time of ClosingVerbatim quote: “the Concessionaire shall pay the IFA the exact amount of $3,800,000,000.00 in cash”Source, Section 2.1, p. 25
Deposit held before closingFigure: 10%Basisof the Rent, as cash or letters of creditVerbatim quote: “in an aggregate amount equal to 10% of the Rent”Source, Section 2.3(a), p. 26
Term of the leaseFigure: 75yearsBasisends on the 75th anniversary of the Closing DateVerbatim quote: “commencing on the Closing Date and expiring on the seventy-fifth (75th) anniversary of the Closing Date”Source, Section 2.1, p. 25
Also in these documents. Not shown in this sample.Request a workbook
Payment to the grantor under the First AmendmentNot shown in this sample
Payment to the grantor under the Second AmendmentNot shown in this sample
Revenue sharing with the grantor: thresholds and sharesNot shown in this sample
Extension of the term under the Second AmendmentNot shown in this sample

What counts as a competing highway, and what follows if one opens.

Competing highway, as definedFigure: 20continuous milesBasislength of new highway lying near the toll roadVerbatim quote: “any newly-constructed Comparable Highway which is built by or on behalf of the State during the Term and at least twenty (20) continuous miles of which is within ten (10) miles of the Toll Road”Source, Section 1.1, p. 5
Competing highway, as definedFigure: 10milesBasisdistance from the toll roadVerbatim quote: “any newly-constructed Comparable Highway which is built by or on behalf of the State during the Term and at least twenty (20) continuous miles of which is within ten (10) miles of the Toll Road”Source, Section 1.1, p. 5
Opening of a competing highwayBasislisted among the Compensation EventsVerbatim quote: “the placement in service of a Competing Highway as contemplated in Section 14.1(e)”Source, Section 1.1, p. 5
Also in these documents. Not shown in this sample.Request a workbook
Adverse action: what the concessionaire may claimNot shown in this sample
Adverse action: period for the concessionaire's noticeNot shown in this sample
Adverse action: period for the grantor to disputeNot shown in this sample

Minimum limits the concessionaire must carry.

Employer's liability, minimum limitFigure: 500,000US$Basiseach accident or illnessVerbatim quote: “Employer's Liability Insurance coverage with limits of not less than $500,000 each accident or illness”Source, Section 13.1(a), p. 79
Commercial general liability, minimum limitFigure: 75,000,000US$Basisper occurrenceVerbatim quote: “Commercial General Liability Insurance or equivalent with limits of not less than $75,000,000 per occurrence for bodily injury, personal injury and property damage liability”Source, Section 13.1(b), p. 79
Automobile liability, minimum limitFigure: 10,000,000US$Basisper occurrenceVerbatim quote: “Automobile Liability Insurance with limits of not less than $10,000,000 per occurrence for bodily injury and property damage”Source, Section 13.1(c), p. 79
Also in these documents. Not shown in this sample.Request a workbook
Professional liability, minimum limitNot shown in this sample
Pollution legal liability, minimum limitNot shown in this sample
Railroad protective liability, minimum limitsNot shown in this sample

Cure periods for each party and for lenders, and the change-in-control threshold.

Concessionaire's failure to perform a material obligation: cure periodFigure: 90daysBasisfollowing notice from the grantorVerbatim quote: “continues unremedied for a period of 90 days following notice thereof”Source, Section 16.1(a)(i), p. 91
Grantor's failure to perform a material obligation: cure periodFigure: 60daysBasisfollowing notice from the concessionaireVerbatim quote: “such failure continues unremedied for a period of 60 days following notice thereof”Source, Section 16.2(a)(i), p. 94
Lender's additional cure periodFigure: 30daysBasisbeyond the concessionaire's own cure periodVerbatim quote: “The Leasehold Mortgagee shall have a period of 30 days with respect to any Concessionaire Default beyond any cure period expressly provided to the Concessionaire herein”Source, Section 18.3, p. 103
Change in control: ownership thresholdFigure: 50%Basisor more of the voting or economic interests, direct or indirectVerbatim quote: “a change in ownership so that 50% or more of the direct or indirect voting or economic interests in such Person is transferred to a Person or group of Persons acting in concert”Source, Section 1.1, p. 4
Also in these documents. Not shown in this sample.Request a workbook
Termination by the grantor for convenience: whether the right existsNot shown in this sample
Letter of credit for end-of-term capital works: when dueNot shown in this sample
Toll Road Concession Value, as definedNot shown in this sample

Notice of a delay event, mediation before arbitration, governing law.

Notice of a delay eventFigure: 10Business DaysBasisfollowing the date the concessionaire first became aware of itVerbatim quote: “it shall give notice within 10 Business Days following the date on which it first became aware”Source, Section 15.1, p. 89
Mediation period before arbitrationFigure: 30Business daysBasisfrom the date the mediator is selectedVerbatim quote: “does not resolve the dispute within thirty (30) Business days from the date the Mediator is selected”Source, Section 19.4, p. 108
Governing lawVerbatim quote: “This Agreement shall be governed by, and interpreted and enforced in accordance with, the laws in force in the State of Indiana”Source, Section 20.6, p. 112
Also in these documents. Not shown in this sample.Request a workbook
Informal dispute resolution: periodNot shown in this sample
Arbitration: rules, and the deadline to beginNot shown in this sample
Arbitration panel: number of arbitratorsNot shown in this sample

Condition of the pavement and bridges, as the annual report for 2025 prints it.

Bridges inspectedFigure: 333bridgesBasiseach inspected every two yearsVerbatim quote: “responsible for inspecting 333 bridges. Each bridge is inspected every two years.”Source, Part A, p. 10
Mainline roughness (IRI): the lease requirementFigure: 150in / miBasisthe average of the mainline is to stay below thisVerbatim quote: “The roughness index on the mainline pavement shall be maintained below an average of 150 in / mi.”Source, Part A, p. 13
Mainline roughness (IRI): average measuredFigure: 63.44in / miBasis2025 survey, average of the entire mainlineVerbatim quote: “2025 IRI one-tenth mile < 150 63.44”Source, Table 1.3, p. 14
Mainline roughness (IRI): average measuredFigure: 69.35in / miBasis2024 survey, average of the entire mainlineVerbatim quote: “2024 IRI one-tenth mile < 150 69.35”Source, Table 1.3, p. 14
Mainline roughness (IRI): average measuredFigure: 69.40in / miBasis2023 survey, average of the entire mainlineVerbatim quote: “2023 IRI one-tenth mile < 150 69.40”Source, Table 1.3, p. 13
Mainline pavement quality index (PQI), averageFigure: 92.2PQIBasis2025, the last of the nine yearly columns, 2017 to 2025Verbatim quote: “Average PQI 92.1 89.9 88.2 90.6 90.0 91.6 90.7 90.3 92.2”Source, Table 1.4, p. 14
Also in these documents. Not shown in this sample.Request a workbook
Mainline rutting: average measuredNot shown in this sample
Bridge condition ratings, by elementNot shown in this sample
Toll plaza ramp pavement: condition by plazaNot shown in this sample

The original agreement, its seven amendments, the restatement and the two amendments since, by date.

Date, as printed: April 12, 2006Concession and Lease AgreementVerbatim quote: “the Indiana Toll Road Concession and Lease Agreement, dated as of April 12, 2006”Source, cover page
Date, as printed: April 12, 2006First AmendmentVerbatim quote: “the First Amendment to the Indiana Toll Road Concession and Lease Agreement, dated as of April 12, 2006”Source, cover page
Date, as printed: June 29, 2006Second AmendmentVerbatim quote: “the Second Amendment to the Indiana Toll Road Concession and Lease Agreement, dated as of June 29, 2006”Source, cover page
Date, as printed: August 10, 2007Third AmendmentVerbatim quote: “the Third Amendment to the Indiana Toll Road Concession and Lease Agreement, dated as of August 10, 2007”Source, cover page
Date, as printed: February 5, 2008Fourth AmendmentVerbatim quote: “the Fourth Amendment to the Indiana Toll Road Concession and Lease Agreement, dated as of February 5, 2008”Source, cover page
Date, as printed: November 1, 2010Fifth AmendmentVerbatim quote: “the Fifth Amendment to the Indiana Toll Road Concession and Lease Agreement, dated as of November 1, 2010”Source, cover page
Date, as printed: April 1, 2016Sixth AmendmentVerbatim quote: “the Sixth Amendment to the Indiana Toll Road Concession and Lease Agreement, dated as of April 1, 2016”Source, cover page
Date, as printed: December 15, 2016Seventh AmendmentVerbatim quote: “the Seventh Amendment to the Indiana Toll Road Concession and Lease Agreement, dated as of December 15, 2016”Source, cover page
Date, as printed: July 1, 2017Amended and Restated Concession and Lease AgreementVerbatim quote: “AMENDED AND RESTATED INDIANA TOLL ROAD CONCESSION AND LEASE AGREEMENT dated as of July 1, 2017”Source, cover page
Date, as printed: September 21, 2018First Amendment to the restated agreementVerbatim quote: “the First Amendment to the Amended and Restated Indiana Toll Road Concession and Lease Agreement, effective September 21, 2018”Source, Section 5(a), p. 4
Date, as printed: April 17, 2026Second Amendment to the restated agreementVerbatim quote: “the Second Amendment to the Amended and Restated Indiana Toll Road Concession and Lease Agreement, effective April 17, 2026”Source, Section 5(b), p. 9

This sample cites four documents. The grantor publishes others for this asset. A delivered workbook lists every source with its address.

Not shown in this sample.Request a workbook
Not shown in this sample
Not shown in this sample
Not shown in this sample
Not shown in this sample
Not shown in this sample
Not shown in this sample
Not shown in this sample
Not shown in this sample
Blue: a figure or date as the source prints it.Green: a link. A source tag opens the Sources tab.Blurred: not shown in this sample.Nothing is totaled, converted or estimated.

The quote is the source's own wording. The page is the printed page of the cited document.

This sample is cut from four documents on one asset. A workbook made for a request covers the topics you name, across the documents the public record holds. The full list of topics

How it works

  1. Send the request

    Use the form below. Name the assets, countries or sectors and the fields you need.
  2. Receive the scope

    We reply within one business day with the scope: what the record holds, what it does not, and what the work would involve.
  3. Receive the workbook

    Every row points to the page it came from, so a question on any figure can be checked against the source.

Where the data comes from

Records are built from primary public sources: government procurement portals and gazettes, sector regulators, stock-exchange filings, multilateral project databases, and the documents grantors and concessionaires publish themselves. The registry tracks 22,000+ concessions across 185 countries and 15 sectors. Depth varies by country and sector, and the scope reply says where the record is thin. Method: /docs/methodology.

The full list, by topic

These are the items a concession's public record can hold: its contract, the official gazette, regulator decisions and company filings. A request can cover any of them, for one concession or across a set. Each item comes back as the source states it, with the quote and page, or marked "not on record".

Parties, award and term

  • Grantor and contracting authority
  • Concessionaire and its shareholders
  • Contract type as the source names it: BOT, BOOT, lease, affermage, PPP or PFI
  • Award process: tendered or negotiated, the bidders and the award criteria
  • Award, signing, financial close, start of term and start of operations, each as its own date
  • Term, extension options and end date

Fees and payments to the state

  • Entry fee or upfront payment
  • Fixed annual fee, concession fee, canon or royalty
  • Variable fee and revenue share
  • Minimum guaranteed payments and minimum volumes
  • Indexation and deferral of fees

State support and advantages granted to the concessionaire

  • Tax regime: rates, exemptions, tax holidays and stabilization clauses
  • Customs duty and VAT exemptions
  • Minimum revenue and minimum traffic guarantees
  • Sovereign guarantees and payment guarantees
  • Grants, subsidies and availability payments
  • Land, site delivery and resettlement
  • Exclusivity and non-compete undertakings
  • Works and utilities the state provides: access roads, rail links, dredging, power and water

Investment and financing

  • Investment commitments and their schedule
  • Project cost as announced
  • Split of investment between the state and the operator
  • Lenders, loan amounts and signing dates, including development-bank loans
  • Refinancings
  • Business plan figures where published: traffic forecast, rate of return and payback

Tariffs and regulation

  • Tariff schedule as published
  • Tariff-setting and indexation formula
  • Tariff reviews and resets
  • Economic rebalancing of the contract
  • Allowed return, allowed revenue and regulated asset base
  • Regulator decisions that apply to the concession

Contract clauses, quoted verbatim

  • Termination: triggers, cure periods and compensation on termination
  • Force majeure and change in law
  • Step-in rights and lender rights
  • Handback condition at the end of the term
  • Performance standards, penalties and liquidated damages
  • Change of control and assignment
  • Dispute resolution, arbitration seat and governing law
  • Insurance, performance bonds and guarantees
  • Environmental and social obligations

Events since signing

  • Amendments and addenda
  • Renegotiations and extensions
  • Tariff changes
  • Construction milestones and start of operations
  • Disputes and arbitration awards
  • Terminations and re-tenders

Traffic, capacity and results

  • Traffic and volume by year: passengers, vehicles per day, TEU, cargo tonnes and aircraft movements
  • Capacity: installed megawatts, quay length, berths and route length
  • Network figures: connections, population served, water volume, energy billed and gas delivered
  • Revenue and results, where the concession company or its shareholders publish them

Ownership and transactions

  • Current shareholders and their stakes
  • Stake sales: buyer, seller, date, stake and price where disclosed
  • Changes of operator

Expiries and tenders

  • Concessions reaching the end of their term inside a window you set
  • Tenders announced or open
  • Re-tenders of expiring concessions

The list is not a limit. If your question is not on it, send it anyway. The scope reply says what the record holds. Go to the request form

Request data

Name the assets, countries or sectors and the fields you need. We reply within one business day.

Frequently asked questions

Can I get infrastructure concession data without a platform subscription?
Yes. A data request is a one-off. You name the assets, countries or sectors, and receive a sourced workbook. No subscription is needed.
What concession data can I request?
Anything a public document states about a concession. The list on this page covers the parties and term, fees and payments to the state, tax treatment and other state support granted to the concessionaire, investment commitments and financing, tariffs and regulation, contract clauses quoted verbatim, events since signing, traffic and capacity, ownership and transactions, and expiries and tenders. A question that is not on the list can still be sent.
What format is the data delivered in?
An Excel workbook. Each figure has its own row with its unit, its basis, the verbatim quote from the source, and the document and page. A sources tab lists every document cited.
Where do the figures come from?
Primary public sources: concession contracts, government gazettes, procurement portals, regulator filings, stock-exchange disclosures and multilateral project databases. Wikipedia, paywalled aggregators and fund marketing pages are not accepted as sources.
What does Concessio cover?
Government-granted infrastructure concessions and public-private partnerships across 15 sectors, including toll roads, airports, ports, rail, water, and power and gas networks. Depth varies by country and sector, and the scope reply says where the record is thin.
What if the asset I need is not in the registry?
Say so in the request. Where primary sources exist, the asset can be researched as part of the work. Where they do not, the scope reply says so.

See Concessio on your own market

Request a demo and we'll walk you through the concessions, clauses, and regulatory events that matter to your team.